Internal Stakeholder Management in ZESCO Distribution Projects

Authors

  • Sililo Mundia
  • Mundia Muya

DOI:

https://doi.org/10.59573/emsj.7(5).2023.6

Keywords:

Internal stakeholder management, ZESCO distribution projects, Project performance

Abstract

The study reported in this paper investigated internal stakeholder management in ZESCO distribution projects, recognizing the influence of stakeholders on both project performance and success. The objectives of the study were to: find out factors that influence stakeholder management on ZESCO distribution projects; establish the degree of influence of stakeholder engagement on the performance of ZESCO distribution projects; determine the impact of stakeholder mapping on the performance of ZESCO distribution projects; and describe the relationship between stakeholder management and the performance of ZESCO distribution projects. The objectives were achieved by employing a mixed method research approach, incorporating both qualitative and quantitative methods. The study sample encompassed ZESCO employees engaged in various distribution projects, and data was gathered through interviews and questionnaires. The findings underscored the critical role of effective stakeholder mapping, engagement and management in the success of ZESCO distribution projects. It was established that addressing internal stakeholders’ concerns and proper engagement positively influences project performance. Additionally, it was established that engaging internal stakeholders at various project stages improves project delivery. The findings also indicated that internal stakeholder mapping is valuable for project duration, cost management, environmental considerations, and conflict resolution.

References

Abdalla, S., & Elmualim, A. (2020). Impact of Stakeholder Management Tools and Techniques on Construction Project Success. Academia.edu.

Baharuddin, H. W., & Costello, S. (2013). Evaluating early stakeholder engagement (ESE) as a process for innovation. In CIB World Building Congress.

Batidzirai, B., Moyo, A., & Kapembwa, M. (2018). Willingness to pay for improved electricity supply reliability in Zambia. Retrieved 2023, from https://www.theigc.org/wp-content/uploads/2019/01/Batidzirai-2018-Final-report.pdf

Bergasse, E., & Paczyski, W. (2013). The relationship between energy and economic and social development in the southern Mediterranean.Energy and climate change mitigation. European commission’s seventh framework research programme.

ERB. (2022). Energy Sector Report 2022. Lusaka: Energy Regulation Board.

Freeman, R., & McVea, J. (2005). A stakeholder approach to strategic management. . The Blackwell handbook of strategic management, 183-201.

ITA. (2022). Zambia - Country Commercial Guide. Retrieved January 03, 2023, from https://www.trade.gov/country-commercial-guides/zambia-energy#:~:text=There%20are%20five%20main%20electricity,)%3B%20and%20Maamba%20Collieries%20Limited

Johnston, H. (2019). The Effects of Stakeholder Engagement Practices on Energy Projects. Graduate Program in Sustainable Energy Development, 19-23.

Jones, K. M. (2021). An examination of challenges of way leave aquisition for infrastructure development in Kenya, a case study of Kiisi-Awendo power transmission line. Nairobi: University of Nairobi.

Liu, T. W., & Wilkinson, S. (2016). Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public–Private Partnerships (PPPs): A comparative analysis of Australia and China. International Journal of project management, 34(4), 701-716.

Ministry of Finance and National Planning. (2022). Eighth National Development Plan 2022-2026. Lusaka: Ministry of Finance and National Planning.

Mok, K. G., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International journal of project management, 33(2), 446-457.

Muchiya, T. (2022). Even as ZESCO proposes to increase connection fees – 70% of households not connected to electricity national grid. Retrieved from https://zambianbusinesstimes.com/even-as-zesco-proposes-to-increase-connection-fees-70-of-households-not-connected-to-electricity-national-grid/

Mwanaumo, E. M., Nsefu, M. K., Mambwe, M., & Sakala, N. (2020). Impact of Stakeholder Engagement on Performance of Construction Projects in Lusaka District. Harare: IEOM Society International.

Ngetich , G., & Gakuu, C. (2019). Influence of stakeholder management plan on project performance: a case of Olkaria geothermal power project, Nakuru county. International Academic Journal of Information Sciences and Project Management, 3(5), 218-237.

Pacagnella, A. C., Porto, S. G., Pacífico, O., & Salgado, A. P. (2015). Project Stakeholder Management: A Case Study of a Brazilian Science Park. J. Technol. Manag. Innov, 10(2), 39-49.

Rankinen, J., & Lakkala, S. H. (2022). Stakeholder management in PED projects: Challenges and management model. International Journal of Sustainable Energy Planning and Management, 34, 91-106.

Retfalvi, L. A. (2014). Project success using proven stakeholder management techniques. Paper presented at PMI® Global Congress 2014-North America, Phoenix, AZ. Newtown Square, PA: Project Management Institute.

USAID. (2018). Zambia Power Sector Assessment. Power Africa.

ZamStats. (2016). Living Conditions Monitoring Survey 2015. Lusaka: ZamStats.

Zarewa, G. A. (2019). Barriers to Effective Stakeholder Management in the Delivery of Multifarious Infrastructure Projects (MIPs). Journal of Engineering, Project, and Production Management, 9(2), 85-96.

ZESCO. (2016). Integrated Report. Retrieved 2023, from https://www.zesco.co.zm/storage/financial_statements/ZESCO-Integrated-Report-2016.pdf

Zesco. (2022). About. Retrieved January 03, 2023, from https://www.zesco.co.zm/#:~:text=It%20is%20a%20vertically%20integrated,to%20local%20and%20international%20markets

Downloads

Published

2023-11-23

Issue

Section

Articles